📞 Call Now: 0125 624 2410Flat roofs fail in a small number of predictable ways, and which one applies decides whether a patch is sensible or simply postpones a replacement at extra cost.
When it is not the answer: If the covering is under 15 years old and the failure is one identifiable split or puncture over a sound deck, a localised repair is the honest answer at a fraction of replacement cost. Read the full guide.
A roof window is a pitched-roof unit set into the plane of the tiles, weathered with a flashing kit matched to your specific tile profile. Velux is the dominant brand and the one we fit most, though Fakro and Keylite units are equally sound and sometimes better value. The critical detail is the flashing kit: a unit specified for slate fitted to a deep-profile concrete tile will leak, and no amount of sealant fixes it.
A flat roof lantern or roof light sits on an upstand kerb built into a flat roof, most commonly over a kitchen extension. The waterproofing junction between the kerb and the flat roof membrane is where these fail. We build the kerb, dress the GRP or EPDM fully up and over it, and set the unit onto that — rather than sealing the unit to a flat deck and hoping.
Dormer windows are a different job again. A dormer is a small structure projecting from the roof slope with its own roof, cheeks and multiple flashing junctions. On Basingstoke's stock they appear on loft conversions across most estates and as original features on some 1930s and earlier properties. They fail at the junctions, almost without exception.
We also fit blackout and thermal blinds, electric openers and rain sensors as part of installation, which is considerably cheaper than retrofitting later.
The trussed rafter roofs used across Popley, Winklebury, South Ham and Buckskin were designed as structural triangles, and cutting any member without engineering input compromises the whole roof. This matters directly for roof windows: a standard Velux fits between existing rafters at 600mm centres without structural alteration, but anything wider needs a trimmed opening with proper structural support.
We size to fit between the existing rafters wherever possible. Where a larger unit is genuinely wanted, the opening is trimmed with new timber sized to carry the load and the work is notified to building control. What we will not do is cut a truss member and hope.
Flat roof lanterns over rear kitchen extensions are common across the newer estates and are the single most frequent roof light job we quote. Many of the original installations from the 1990s and 2000s used a sealant-dependent junction between the lantern kerb and the flat roof covering. Those are now failing at 20–25 years, typically appearing as a damp line along one edge of the lantern reveal internally.
The fix is to strip back the covering, rebuild the kerb, and dress new GRP fully up and over the upstand before setting the unit. It costs more than resealing and it is the last time it needs doing.
Roof windows on the street-facing elevation of a property in the Old Basing conservation area will generally not get consent, and on a listed building certainly will not. Conservation-grade units — low-profile, black-finished, with a central glazing bar to mimic a traditional rooflight — are sometimes acceptable on rear elevations. We advise on what is likely to be approved before you commit to anything, and we would always recommend an informal conversation with the Basingstoke and Deane conservation officer first.
The 1990s–2000s estates have a high density of dormer detail as part of their design, and dormer-to-main-roof flashing is where the volume housebuilders of that era most often cut corners. Lead substitute or mastic was used in place of proper stepped lead on a great many of these. They are failing now, and the symptom is damp appearing on the ceiling directly below the dormer junction.
Prices include the unit, the correct flashing kit for your tile profile, installation, internal plasterboard reveal and making good. Structural trimming and building control notification, where required, are itemised separately.
Roof windows fitted between existing rafters need no structural alteration. Anything requiring a trimmed opening on a trussed rafter roof will need structural design and building control notification — we handle both and itemise them clearly.
Key Fact: Building Regulations Approved Document A requires that any alteration to a trussed rafter roof — including trimming an opening for a roof window wider than the existing rafter spacing — be designed so the structural integrity of the roof is maintained, with truss members never cut without engineered support. Source: Building Regulations Approved Document A — Structure
Thinking about a roof window? Free survey and honest advice on what your roof will take.
Call 0125 624 2410Clear steps from first call to completed work. No call-out fee, no obligation, and a written quote before anything starts.
We measure the rafter spacing, identify your tile profile for the correct flashing kit, check the internal ceiling line, and confirm whether structural trimming is needed.
The quote names the unit, the flashing kit matched to your tiles, glazing specification, and any structural or building control work. Blinds and openers are cheaper specified now than retrofitted.
Tiles are stripped back, the opening formed, the unit set and the flashing kit dressed into the surrounding tile courses. Internally the reveal is boarded and finished ready for decoration.
We water-test the installation before making good internally, register your manufacturer warranty and hand over operating instructions and your 10-year workmanship guarantee.
Ready to start? Call 0125 624 2410 for your free survey.
We check the covering, probe the deck for rot and delamination, measure the existing falls and inspect every upstand and outlet.
GRP or EPDM chosen on the roof's shape, use and access — not on which costs more. Strip, deck, insulation, membrane and trims all itemised.
The old covering comes off completely. We never overlay: it hides deck rot, adds weight and voids the manufacturer guarantee.
Failed timber replaced with marine-grade plywood, and drainage falls built in with firring strips to at least 1:40.
GRP laid wet to a seamless shell, or EPDM fully bonded and mechanically terminated. We water-test drainage before handover.
| Job | Typical duration |
|---|---|
| Porch or bay top | 1 day |
| Single garage | 1–2 days |
| Rear extension | 2–3 days |
| System-built integral sections | 3–5 days |
| Deck replacement | +1–2 days |
GRP resin needs above roughly 5°C and dry conditions to cure, which limits winter scheduling. EPDM tolerates cooler weather and is often the practical winter choice.
Most flat roofs are reached from a tower or ladder with edge protection. Scaffold is specified for: first-floor and above, any roof with a walk-on requirement, and anywhere edge protection cannot be safely tower-mounted - always itemised in your written quote, never a hidden extra, and we arrange it.
Most Basingstoke estate housing has generous verges and driveway space, so scaffold and skips drop straight onto private ground. The older streets around the Top of Town are the exception, with narrow frontages and controlled on-street parking. Pavement scaffold and skip permits go through Basingstoke and Deane Borough Council; allow a few working days on streets like Wote Street, Church Street, New Street where space is tight.
| Job | Typical range | Notes |
|---|---|---|
| Porch or bay top | £650–£1,200 | Minimum-job pricing applies |
| Single garage — EPDM | £1,200–£1,900 | One-day fit, 20-year guarantee |
| Single garage — GRP | £1,500–£2,400 | Rigid walkable finish, 25-year guarantee |
| Extension roof — EPDM | £2,000–£3,400 | Simple rectangular areas |
| Extension roof — GRP | £2,400–£4,200 | Preferred where upstands or outlets are involved |
| System-built integral sections | £2,400–£4,800 | South Ham, Popley — new deck and rebuilt falls |
Worked example: Three integral flat sections on a system-built semi on Crossborough Hill, South Ham: strip, new marine ply deck, rebuilt falls and GRP throughout — £4,100 including VAT over four days.
A 10 to 20% deposit on material order for flat roof work, balance on completion after the water test. Nothing before materials are on site. All prices include VAT.
Covering RG21, RG22, RG23, RG24 and surrounding postcodes.
GRP carries a 25-year manufacturer guarantee and EPDM 20 to 25 years, both alongside our written 10-year workmanship guarantee.
If a fault appears in covered work, we come back and put it right. No quibbling, no re-charge.
Noise during strip, and GRP has a distinct resin smell for a day that disperses quickly. Access to the room below is unaffected. You do not need to stay home for external work - we just need power and access agreed in advance.
EPDM installs in most conditions. GRP needs a genuinely dry window, so we schedule it around the forecast rather than pressing on and producing a finish that fails. Basingstoke sits on chalk downland at around 80 metres, so drying is quick after rain but frost nights run longer than the Hampshire coast.
"Two Veluxes in the loft conversion. They sized them to fit between the existing trusses rather than cutting anything, which another firm had blithely offered to do. £2,700 for the pair, fitted and finished."
"Lantern over the kitchen extension had leaked along one edge since we moved in. They stripped it back, rebuilt the kerb and dressed the GRP right up and over. Bone dry through the winter."
"Dormer junction was mastic, not lead — original builder's shortcut. Proper stepped lead fitted for £1,100 and the ceiling stain has finally stopped spreading."
£1,200–£1,900 for a standard unit fitted between existing rafters, including the flashing kit, internal reveal and making good. Larger units needing a trimmed opening run £1,900–£3,000 plus structural design where required.
Usually no — roof windows on most Basingstoke properties fall under permitted development provided they do not project more than 150mm beyond the roof plane. Conservation areas and listed buildings are the exception, and street-facing elevations in Old Basing will generally need consent.
Yes, and most Basingstoke estate housing has exactly that. A standard unit fits between existing rafters without structural alteration. Anything wider needs a trimmed opening with engineered support — never a cut truss member left unsupported.
Almost always because the original installer relied on sealant between the lantern kerb and the flat roof covering, rather than dressing the membrane fully up and over the upstand. It typically fails at 20–25 years. The fix is rebuilding the junction properly, not resealing it again.
On rear elevations, sometimes, using a conservation-grade unit — low-profile, black-finished, with a central glazing bar. Street-facing elevations are unlikely to get consent. We advise on what is realistic before you commit and recommend an informal conversation with the conservation officer.
Yes — it costs £120–£260 per unit fitted at installation versus considerably more as a retrofit, because the internal reveal is already open. The same applies to electric openers and rain sensors.
Yes. A like-for-like replacement costs £850–£1,500 including a new flashing kit, which we fit as standard — reusing a twenty-year-old flashing kit on a new unit is a leak waiting to happen.
Not sure who to trust? Read our guide: How to choose a roofer in Basingstoke →
No call-out fees. No obligation. Just an honest quote from a local Basingstoke roofer who turns up when they say they will.
0125 624 2410Last updated: August 2026